RoundUp was the in house magazine for workers at the Johnson Space Center. Updating the links is a work in progress, but where absent, the base is:

https://historycollection.jsc.nasa.gov/JSCHistoryPortal/history/roundups/issues/

Add the year-month-day and ‘.pdf’ to complete it.

Search the page to find articles of interest.

The complete index is here:

https://historycollection.jsc.nasa.gov/JSCHistoryPortal/history/roundups/roundups.htm


61-11-01

Saturn shot successful

The Project Mercury astronauts                                     

AB Shepard First US Astronaut in space

VI Grissom makes second US space flight

             

61-11-15

Cape Canaveral busy as MA-5 is readied

Personnel scatter over Earth to man tracking stations

Shepard tells ‘a pilot’s view of a trip to the moon’

Water egress training is important phase of recovery program

One of MSC’s early problems included choice of parachutes


61-11-29

Hangar S includes the crew quarters

The white room - a spotless, busy work area

Reaction control test area has vital role

Project mercury launch vehicles


61-12-13

MA-5 mission deemed success

Project Mercury announces plan for 2 man spacecraft

Glenn, Slayton are named for orbital missions

Next mercury orbital flight will be manned

USC developed special equipment for MA-5 flight

Mercury Control Center operations prove complex and exciting

Contract awarded to North American for project apollo


61-12-27

Mercury flight chronology from inception listed

Space maintenance study made recently at Huntsville

Four additional companies named to work on Apollo


62-01-10

Mercury auxiliary flotation collar test proves successful

Project mercury tracking network set to support scheduled orbital missions

Apollo spacecraft circumlunar configuration

MSCs two-man spacecraft to be called gemini


62-01-24

MSC personnel prepare for MA-6 flight

Mercury emergency egress committee plans, trains personnel to insure astronauts’ safety


62-02-07

‘We’ll go when all the tests are completed satisfactorily’

Problems of handling news media corps for manned orbital missions are told

Scale model of Ranger 3 spacecraft

Project mercury MA-6 support by defense department listed

Weather has important role in manned orbital flights


62-02-21

John Glenn orbits Earth three times

Mercury recovery force is deployed

Apollo contract given to GE


62-03-21

Carpenter replaces Slayton on MA-7


62-04-04

More astronauts to be picked soon - civilian pilots eligible

Gemini flights may begin next year

‘Dresser of astronauts’ discusses many problems of what one wears in space


62-04-18

Thiokol to build apollo spacecraft jettison motor

Apollo spacecraft design will feature versatility

Procedures trainer exercises offer astronauts a variety of realistic circumstances they could find in space flight

Results of Glenn’s Mercury-Atlas flight are presented


62-05-02

Astronaut applications being accepted till June 1

Second Saturn flight termed complete success

Astronaut Glenn discusses observations during MA-6 flight

Hours and hours of breathing - ECS tests try men as well as equipment

Ranger 4 hits dark side of moon Thurs

Getting in and out on the moon, or how big should the door be

Collins radio company reveals apollo telecommunications plans

MA-6 flight objectives accomplished

No adverse effects so far, say flight doctors


62-05-16

MA-7 preparations near completion

Behaviour of liquids in space to be studied during MA-7

MA-7 experiment to determine how colors reflect in space

IBM will develop gemini guidance computer system


62-05-30

Three more orbits added to record


62-06-13

Carpenter gets fast tour, hero’s welcome

Ilikon corporation to test metals for Apollo project

Bendix awarded tracking station operation contract

Rocket power Inc. To build gemini escape catapult


62-06-27

Garrett airesearch to develop apollo environmental system

Northrop readies for development of landing system


62-07-11

Schirra to pilot six-orbit mission in September

Scott Aviation is selected for Apollo regulator device


62-07-05

Schirra announces spacecraft changes via telstar

Emphasis to be placed on lunar orbit method

Slayton is grounded from mercury flights

Beech will build gas storage tanks for Apollo craft

Moon flights to be controlled from center here, says Webb

MIT will employ Honeywell computer on moon problems

Microdot gets contract for temperature measurement


62-08-08

Moon now subject for maps instead of a rhyme for spoon

What do astronauts eat before a flight? Here’s the answer

Rocketdyne gets F-1, J-2 engine production contracts

MSC studies high altitude haberdashery


62-08-22

MA-7 conference reviews results in detail

Search for our lunar landing site narrows


62-09-05

Manned space flight weather unit moves in

Saturn stage two engines test fired

Gemini mockup conference views emerging spacecraft

Northrop completes qualification for parachute landing system

Apollo heat shield support panels ordered from Aeronca

NASA’s Goddard spaceflight center is hub of two worldwide tracking networks; has 3 satellite projects underway

Motorola is selected to develop gemini digital command system

Lewis Space Center’s space chamber simulates moon - and further

AC moves into high gear for Apollo guidance works

Melpar to build beacon antenna for Apollo craft


62-09-16

MSC names nine new pilot trainees - new group slightly younger, includes two civilians

Conference gets close look at gemini spacecraft


62-10-03

MA-8 readies for first US six orbit launch

Marshall spaceflight center developing saturn family of space vehicles for manned lunar exploration


62-10-17

MA-8 opens way for one-day flight next trip

Text book flight near perfect

Changes in spacecraft helpful, says astronaut


62-10-31

Thiokol to build Gemini rockets

Hamilton standard gets a contract for Apollo suit


62-11-14

Grumman selected to build excursion module

Cooper to fly MA-9, Alan Shepard is backup

Langley Research Center hails the space age with construction of massive new facilities, improvements

Gemini astronauts do work with docking simulator


62-11-28

Scale model of Grumman LEM

Launch operations center at Cape Canaveral is ‘Shooting end’ of NASA’s space exploration,. Activities

Third saturn c-1 test is ‘perfect’

EMR to develop Gemini data transmission, record system

Image instruments to develop scan converter for TV


62-12-12

Two Apollo test mockups delivered to Northrop


62-12-26

Mercury-Atlas missions test objectives & data summary

Wallops station conducts operational launches for scientific experiments and spacecraft testing

Apollo test conference is conducted at white sands


63-01-09

RCA to build solar simulation system for new space chamber


63-01-23

Gemini ‘chute tests proceeding successfully

Crew systems tests new type of astronaut couch


63-02-06

NASA confirms delay in MA-9

MA-8 booster performed extremely well

Rendezvous not difficult if unhurried, says Schirra

Fuel conservation during MA-8 excellent

Two major apollo contracts given

Astronaut trainees get specialised assignments


63-02-20

MA-9 rescheduled to middle of May

Plywood model of LEM

Gemini antenna contract awarded to deHavilland

McDonnell Aircraft of St Louis, Mo. Has prime contract for MSC’s Mercury and Gemini spacecraft

Motorola to build Apollo Spacecraft’s transponder

Gemini chute test is completed

Raytheon gets contract for apollo computer

Elgin will build timekeeping device for Apollo module

Contract for Apollo tape recorder goes to Leach Corporation


63-03-06

Saturn V first stage will be built by Boeing company

Two Mercury tracking ships get ready for Cooper mission

Motorola building S-Band transponder

Series of Apollo test firings completed by various makers

Gemini landing trainer will be finished by AM&F soon

US Thanks 16 countries for tracking


63-03-20

NASA, Grumman sign $387m contract

Slow Scan TV camera may be used on MA-9

Apollo test craft arrives at MSC, goes to Marshall


63-04-03

Saturn ends phase one tests with fourth successful shot

Cooper, Shepard test spacecraft for MA-9 flight

Pendulum for Apollo - impact test facility

Apollo boilerplate service module arrives for vibration testing

Space suite evaluator to assist in establishing efficient design

Firms selected to build fuel tanks for Apollo


63-04-17

Saturn second stage readied for fall launch

Apollo ECS testing begins

Design work on acceleration facility is moving forward

North American’s space and information systems division builds apollo command and service modules

Apollo test facility going up at White Sands range


63-05-01

Saturn S-IV starts trip to canaveral

Transposition and docking

No technical reasons to stop moon trip by 1970

Grumman aircraft engineering corp builds LEM which will one day touch down on the moon’s surface

General Precision Inc gets spacecraft simulator contract


63-05-15

Cooper flight to utilize live TV broadcasting

MA-9 mission scheduled not sooner than May 15

[MA-9 mission experiments]

MIT’s instrumentation laboratory teams up with industry to design Apollo’s navigation system

Apollo drop test successful at Northrop Ventura


63-05-29

Cooper wraps up one day flight during MA-9


63-06-12

MA-9 problems on reentry traced to insulation break

Gemini parachute tests enter qualifying stage

Apollo mission simulators ordered for Houston and cape

Digital computers ordered for Saturn V checkout

Eight astronauts practice troubled moon landing well in advance

Space technology laboratory to build LEM descent engine

Three days in Panama jungle teach astronauts to survive

Apollo spacecraft cutaway drawing


63-06-26

Mercury ends - no MA-10 planned

Mercury-Little Joe/Redstone/Atlas missions and test objectives

Kollsman Instrument Corporation provides the ‘Eye’ for Project Apollo’s Guidance-Navigation system

ITT gets contract for Apollo storage battery charger units

NASA signs with AC spark plug for $35m


63-07-10

RCA picked for $40m LEM contract

Gemini ejection seat undergoes rocket sled tst

Lockheed gets contract for launch escape motor

Hamilton standard is busy engaged in space suit work

Frictionless platform simulates space motion

Big animated system trainer teaches spacecraft operation


63-07-24

Gemini suits being tested by Goodrich

Little Joe delivered at White Sands for Apollo test

AC Spark plug working on guidance, navigation systems

Apollo components arrive at Canaveral

Aeronca awarded contract for Apollo spacecraft skin


63-08-07

Computer equipment contract goes to IBM

Bell aerosystems awarded contract to develop ascent rocket engine for LEM


63-08-21

Apollo contract largest NASA has negotiated to date

Gemini recovery system qualifies

Raytheon to design, develop Apollo on board digital guidance computer

Constant preparation a prime requirement of being an astronaut

Saturn’s second stage S-IV static test fire successful


63-09-04

Little Joe II gets Apollo program off to a good start

Sight perception of astronaut Gordon Cooper subject of controversy

Moon rocket assembly

Beech Apollo facility tests space hazards

Saturn V tail

Gemini docking trainer going up at clear lake

Gemini structural simulator delivered for tests

Manned lunar landing diagram


63-09-18

Parasail flights by astronauts as part of Gemini preparation

$7,658,000 Apollo contract signed for guidance system

New tracking stations scheduled down under

Gemini ejection seat

Lunar Orbiter photographic missions to screen areas for soft landers


63-10-02

Study indicates particle wall offers best meteoroid shield

Apollo Guidance-Navigation system prototype viewed at MIT

Saturn I Upper stage rocket air-lifted to cape for test

$1m contract awarded for Apollo data acquisition systems and recorder


63-10-16

First of 13 Gemini spacecraft delivered to MSC

Field test branch helps get the bugs out of space hardware

TIROS VI operates full year acclaimed major achievement

Mission Control center to be provided by Philco

Apollo and testing equipment contracts awarded four firms

MSC officials attend Apollo design engineering inspection and review


63-10-30

14 new astronauts introduced at press conference

Study indicates Cooper could have seen what he reported

Air drop of Apollo Spacecraft boilerplate demonstrates low altitude abort conditions


63-11-13

Four Saturn mission deleted Apollo S-1B phase accelerated

WSMR Apollo pad abort test termed successful

Garrett AiResearch has responsibility for environmental control system of Project Gemini and Apollo

Apollo spacecraft explosive actuators contractor selected


63-11-27

Lockheed prime contractor for Gemini target vehicle

IMP satellite to check space radiation levels

Lunar landing tester a real swinger


63-12-11

Shock absorbing crushable honeycomb would permit soft landing on moon

Apollo fuel cell unit

Dummies to aid space suit design

Apollo-Saturn S-1C booster by boeing is in manufacturing phase

Douglas space simulation laboratory to test life size prototype equipment

Space radar for Project Gemini unique in design and purpose


63-12-25

Langley scientists walk on moon

Guidance and control equipment in MSCs space vehicles supplied by Honeywell

GT-1 vehicle photos


64-01-08

First fuel cell delivery called Apollo milestone

MSC’s spacecraft Earth landing systems development by Norhtrop Ventura

Old MCC at cape fitted with Gemini mission simulator

LEM environmental system $8m contract awarded

Local firm will build space test chamber at MSC clear lake site

Tracking station changes made: new site added, another moves


64-01-22

Flight Control, plans, provides training for MSC missions

Mercury and Apollo escape rockets developed by Lockheed

Crushable metal honeycomb under study for soft lunar landings


64-02-05

Two stage SA-5 test is fired successfully

Gemini launch vehicle test firing successful

Ultra high vacuum chamber planned

Avco Corporation/RAD division, designing ablating material for application to command module

Ranger VI hits moon, fails to send back pictures


62-02-19

Little Joe II Delivered To WSMR For Full-Scale Apollo Escape Test

Boilerplate Apollo Spacecraft For SA-6 Delivered To Cape For April Flight

Huge Spacecraft Platform To Simulate Apollo Moon - Flight Characteristics

Research Reveals Moon Particles On Earth

Apollo Service Module Reaction Control Engines Developed By Marquardt

Ranger TV failure to be reviewed by 4 man board

Extra- Vehicular Life -Support Contract Let

418 ‘Satellites’ orbit Earth - 77 added in ‘63


64-03-04

Saturn SA-5 Camera Capsules Use Fibre Optics In First Space Role

Molecular Bonding Process Used On Apollo Cold Plates

Apollo Panel Holes Cut By Dry Drilling

Portable Space ‘Water-Well’ To Supply Astronaut Drinks


64-03-18

Arizona's Mile Deep Grand Canyon Scene Of Astronaut Geology Training

Beech Aircraft To Furnish Cryogenic Storage Subsystem For Apollo Service Module

Apollo Boilerplate Arrives At WSMR For Launch Escape Test


64-04-01

April 7 Earliest date for GT-1 mission

Ultra-high vacuum chamber to test Apollo components

First Orbiting Gemini Spacecraft will Have Windows,But No Lookers

Apollo portable TV camera to send back live pictures of the moon

Apollo's Brazed Steel Honeycomb Skins Supplied By Aeronca

Grand Canyon Geological Completed By All 29 Astronauts

Latest LEM mock-up


64-04-15

Gemini Program Gets Off To A Successful Start

Grissom,Young Named As Prime Gemini Crew

Astronauts Shepard, Borman Try Out Gemini Simulator At Cape Kennedy

Lunar landing research vehicle to undergo tests

RCA 's Contribution To Manned Space Program Covers Many Areas

Giant 62-Ton Door Placed On Lunar Simulation Chamber

Aluminum Pressure Suit Undergoing Tests


64-04-29

Two Apollo Boilerplates On Pads Awaiting Launch

'Center Probe And Drogue' Technique Will Be Lunar Rendezvous Method

Collins Has Major Role In Manned Spacecraft Communications

RCA Contracts For LEM Communications Subsrstem

Bell To Build Propellant Tanks For LEM Reaction Control subsystem

Lunar Vehicle Re-entry Heat Measured By Project FIRE

Next Four Gemini Titan Flights To Carry 23 Experiments On Board


64-05-13

WSMR Flight Tests Apollo Launch Escape System

Gemini rough water egress test is successful in Gulf

IBM computers play big role in space program

Dr. Joseph Shea Describes Apollo Development To 4th Conference On Peaceful Uses Of Space

Proposed Eight Day Lunar Mission Sequence Profile


64-05-27

Cape Kennedy Saturn Launch To Orbit First Apollo Systems

$80m lunar orbiter contract signed with Boeing

Lunar Research Vehicle Delivered To Explore Moon Landing Problems

Spaceflight Simulation Equipment Supplied by Link

Manned Apollo Vacuum Chamber Tests Check Environmental Control System

Extremely Accurate 'Clock 'Development To Help Control Gemini-Apollo Missions

Apollo-Little Joe II Launch At WSMR Described As Most Spectacular Ever

S-Band Streamlined Communication System Being Negotiated For Apollo Lunar Spacecraft


64-06-10

Apollo BP-15 Shipped To Cape For SA-7

Astronauts Wind up Geology Field Trips With Exercise At Philmont Scout Ranch

Apollo's Fuel Cells Being Developed by Pratt & Whitney Aircraft

MSC to have lunar training area will have craters 50 feet across

First relaxation in months earned by BP-13 crew

SA-6 launch is a Roaring Success, Makes 50 Orbits Before Reenteing

Gemini Medical Tests Named For Two-Man Orbital Fligh


64-06-24

Symposium briefs scientists pm Lunar Explorations

Apollo collar tests

Lunar landings by landmarks subject of study

Whirlpool providing food and waste systems for Gemini

Water-Cooled Underwear For Space Being Developed By MSC Engineers

15 Astronauts Taking Survival Course Jungles Of Panama This Week

First Gemini To Be Manned Near Completion in St. Louis


64-07-18

Apollo BP-15 stack

Astronauts given specific assignments

New tracking station joins Gemini network

Possible Gemini Fuel Cell Backup Discovered In Jungles Of Panama

Gemini Inspection Crew Does on the spot factory testing

$20m Apollo Tracking Systems Contract Awarded


64-07-22

AC Named Prime For Guidance Navigation System

Old Mercury Altitude Test Chamber o, Being Modified For Gemini Program

LEM, Agena Engines And Lunar Landing Simulator Built By Bell Aerosystems

Gemini suit for Apollo


64-08-05

McDivitt, White Named Prime Crew For Second Manned Gemini Flight

Successful Ranger 7 Sends Back First US Close Up Moon Pictures

Tool Set Developed For Use On Moon Flight

Dress For Apollo Crews A Far Cry From Mercury Days

Apollo Launch Escape System Checkout Made At Merritt Island

Hook-Loop Device May Keep Astronaut's Feet On Floor

Apollo Spacecraft Clock And Timer Contract Awarded

Desert Survival Training Sessions To Start Monday For 14 Astronaut


64-08-19

14 Astronauts Complete Desert Survival Course

Gemini Drop Tests Measure Landing Impact Forces

Gemini & Apollo Navigation And Control Problems Being Studied Here

MCC At Cape Kennedy Readied For Gemini

Gemini Mission Simulator To Be Operating Soon

‘Canned man’ to test new space suits

Rocket landing boilerplate drop test


64-09-02

Oregon Moonscape Locations Used For Apollo Time and Motion Study

Apollo LES "Man-Rating" Tests Stepped-Up

Apollo Boilerplate Spacecrafts Delivered, to be flown with Pegasus satellites

Electro-Mechanical Research Supplying Telemetry And Data Systems For Gemini Program

Apollo Preflight Acceptance Testing Station Operational

6 Astronauts Get ‘Feel’ of Space In Jet Aircraft Weightless Flights


64-09-16

SA-7 Flight To Further Test Apollo Spacecraft/Launch Vehicle

Analog And Digital Techniques to Simulate Space Flights

GULF COAST VIA NIMBUS I

Meteoroids Space Puncture Rate Surveyed

STL to compute mission simulations


64-09-30

Gemini Spacecraft For GT-2 Delivered To Cape Kennedy

SA-7 Flight A Success, Re-enters After 59 Orbits

Giannini Developing Nucleonic Propellant Gaging System For Apollo


64-10-14

Worldwide Tracking Network Being Tested For Manned Flights

Full Scale LEM Mock-Up reviewd by MSC Team

Final Saturn I Booster Tested By Marshall Center

Apollo service module engine test device being developed

MSC Team Attends Apollo Mock-Up Review

Contract Let For Apollo Heat Shield System


64-10-28

Astronauts pursue geology studies in New Mexico

GT-2 Spacecraft Readied For Launch

Gemini ejection escape system built by Weber aircraft

One Saturn Moon Rocket Test Stand Going Up

Lunar S-Band Antenna Demonstrated


64-11-11

Walker Describes LLRV Flight At Manned Space Flight Meeting

Training crash flight takes astronaut’s life

Cape Kennedy Gemini Mission Simulator Now Operational

Apollo Dynamic Stability Testing

Lear Siegler Furnishing Many Of Indicators For Gemini’s instrument panel

Lunar TV contract awarded to Westinghouse

Gemini Suits Now Being Qualified For Operational Flight Conditions


64-11-25

Docking In Trainer Almost Like Actual Space Maneuver

Gemini Spacecraft-3 Tested In Altitude Chamber


64-12-09

GT-2, LJ/BP-23 Flights Scheduled This Week

Spacecraft insulation provided by Johns-Manville

X-Rays Of Spacecraft's Anatomy Aids Detection Of Hidden Flaws

Saturn V Launch Umbilical Towers Take Shape

Two SA-7 cameras found

Agena Vehicle For First Space Rendezvous

Saturn's 'Eight-Wheel' Brakes


64-12-23

Titan Shut Down Postpones GT-2 Flight 'Til Early 1965

Apollo Launch Escape System Performs As Programed

Apollo Systems Trainers Delivered

Rocketdyne Engines Provided Liftoff Thrust For America's First Space Feats

Developmental Spacecraft Landing Rockets Tested In Bay Using A Gemini Boilerplate

Apollo Suit Proposal Asked Based On Gemini Design

96-Hour Gemini suit test declared complete success


65-01-66

Apollo Spacecraft Adapter Delivered By Helicopters

Gemini 3 spacecraft delivered to Cape

1964 launch highlights

Control Data Computer systems provide support for NASA/MSC programs

Astronaut Geology Field Training to Continue In Hawaiian Islands

Down-to-Earth ‘Moonplot’ ready for MSC studies

NASA Accepts First S-IVB Rocket


65-01-20

Boilerplate Spacecraft, Workhorses Of Space Program

Sperry Rand Contributing Guidance, Control And Computers to NASA Space Programs

Spacecraft landing system to be tested in Fort Hood drop


65-02-03

GT-2 Success Opens Way For Manned Gemini Flights

Flight Controllers In Houston Control Center Monitor Data Relayed From Cape Kennedy

Astronauts Turn Hawaii Island Into Giant Geology Classroom

Engineers Explain Cause Of Gt-2 AbortI n December's Unsuccessful Launch Attempt

X-rays Give Crew Systems "Inside Look' At Pressure Suit Mobility And Comfort

Cape's Launch Complex 16 to be modified for use as static test stand for Apollo

GLV-3 erected on pad for manned Gemini flight


65-02-17

Cooper Conrad: GT-5 Prime Crew

GT-3 Crews Perform Parachute And Egress Training

Escape System For Gemini Qualified In Test Simulations

Six Degree Of Freedom Unit To Simulate Zero And Lunar Gravity Motion Problems


65-03-03

Gemini Spacecraft Launch Vehicle Mated For First Manned Flight

Ranger 8 Takes Photos Of Possible Apollo Landing Area

Beckman Instruments Supplying Medical Flight Monitoring Equipment

LEM Tests Conducted On Air-Bearing Supported Table

Astronauts Study Nevada Volcanic Geology And Craters Created By Nuclear Explosions

GT-3 prime crew train at sea

Gemini S/C 3-A Makes 126 Orbits In Test Simulation


65-03-19

Grissom-Young Flight Scheduled Next Week

Gemini Pressure Suit Passes Final Test, Declared 'Ready To Go' For First Flight

Weather Plays Big Part In Manned Launch; Meteorologists Supply World-Wide Forecast

Proving Grounds For NASA's Apollo Moon Rockets, Isolates Its Noise Problems

Apollo 'Polarity Checker'

GT-3 Recovery Forces Deployed Over planned And Contingency Landing Areas

MSC's Moon Training Area


65-04-02

Another Winner For America's Space Program

Gemini Now Fully Operational,Crew Changes Spacecraft’s Orbit

GT-3 Press Conference

Radiation Inc. Plays Vital Role In NASA's Global Network

Simulated LEM lunar landing Tests Study Possible Stability, Impact Problems

Ranger 9 Sends Back Perfect Photos Of Lunar Surface


65-04-16

Future Gemini Flights To Be Controlled Here

Docking Extravehicular Activities To Be Part Of GTA 6 Mission

Ranger Photos' Significance is Subject Of Symposium

Lunar Training At MSC

GT-4 spacecraft arrives at cape

Realistic Approach Used In Training Program For Gemini Crews

Optical Rendezvous System To Be Developed For LEM


65-04-30

LEM Moon Ascent Engine Test Fired At White Sands

GT-4 Crewmen Train In Gulf Of Mexico

Gemini Launch Vehicle Production Anticipating Frequent Launchings

Gemini Rendezvous Radar Developed for NASA by Westinghouse

Longest "Operating Table" Used To Pack Gemni Chutes

Apollo Launch Escape Motor Qualifies For Lunar Program

Fort Hood Gemini Drop Test

GT-4 astronauts get final fitting of ejection seats


65-05-14

Apollo Launch Escape System Test Scheduled

Apollo Boilerplate-14 Checks, Perfects Systems For Flight To Moon

Apollo Tracking Station Contracted For Bermuda

First S-IC Stage Assembled

Structural And Vacuum Integrity" Tests Passed By Chamber 'A' Here At MSC


65-05-28

Gemini IV Four- Day Flight Set For Next Week

General Electric Providing Operational And Technical Support For Apollo And Gemini Programs

Apollo Suit Being Developed Here By Crew Systems

Launch Escape System Test Provides Unexpected Realism

Landing rocket tests performed here with Apollo


65-06-11

Gemini IV Flight America's Greatest Space Feat, Astronauts Set New U.S. And World Records


65-06-25

Apollo Boilerplate Pad Abort Test To Check Launch Escape System

Astronaut White's Gemini IV Extravehicular Activities Provide Spectacular Subject For Astro-Photographer McDivitt


65-07-09

Scientist-Astronauts Join NASA Space Program

Apollo off the pad abort test Termed An "Unqualified Success"

Langley Facility To Explore, Develop Lunar Rocket Landing Techniques

Borman, Lovell, Prime crew for 14-Day Gemini mission


65-07-23

Practice Rendezvous With Special DeviceTo Be Attempted On Gemini V Mission

Astronaut makes geology field trips to Alaska & Iceland

Pegasus Meteroid Punctured Sections May Be Returned To Earth By Astronaut

Gemini IV Earth Terrain Photos Contain Amazing Detail

Spacelabs, Inc. Supplying Bioinstrumentation Equipment For Gemini & Apollo Space Flights

Apollo Trainer photo


65-08-06

Gemini V Crews Work Long Days, To Prepare For Busy 8-Day Flight

Prototype Back-Pack Here; Use Planned For EVA, Moon

Saturn I Success Story Ends Happily at Cape

Four Scientist-Astronauts Take First Steps To Space

First Two Saturn IB Flight Boost

Instrument Packages To Be Built For Transmission Of Moon Data


65-08-20

Gemini V Rescheduled For Tomorrow Morning

Rocketdyne Engines Make Saturn Man's Most Powerful Machine

Apollo Tracking Station At Corpus to use Unified S-Band system

Launch Vehicle For Moon Surveyor


65-09-03

Gemini V Circles Earth 120 Times In 8 Days, Returns Record Breaking Crew Safe And Sound

Gemini VI Prime Crew Practices Water Egress In Gulf

Gold-Plated Space Visor

Reflections On Man's Urge To Conquer Space

Gemini V Track Display Map


65-09-17

Spacecraft Lost In '62 Recovered

Gemini V Astronauts Meet With News Representatives After Post Flight Seclusion

Gemini V Titan Booster First Stage Recovered From Atlantic In Remarkable Condition

Vital Part Played By Pratt & Whitney RL10 Rocket Engines in Saturn Program

LEM Descent Stage Testing At WSTF

Gemini Vl Docking Exercise


65-10-01

Gemini VI Rendezvous And Docking Mission Set

Gemini VIII Flight Crew Named; Mission includes Rendezvous, EVA

Gemini VII Spacecraft Completes Altitude Chamber Acceptance Tests

Radiation Control Contract Awarded

Long Duration Apollo Flights To Carry 5,000-Pound Experiments Pallet

Chrysler Space Division Building Saturn-IB Boosters For Apollo

Dunking In Oil Provides Data On Zero Gravity Exposure

Unified S-Band communication system contract awarded


65-10-15

Lightweight Gemini Suit In Qualification Tests

Gemini VI ready For Launch; Spacecraft VII Taken To Cape

Saturn V booster rollout

Douglas S-IVB Stage On All Saturn Series


65-10-29

Gemini VI Mission Scrubbed When Agena Fails To Orbit

Comsat asked for satellite services to support Apollo

Apollo "Bubble" Type Helmet Gives More Visibility, Comfort

Boeing Building S-IC Stages Where Once Plantation Stood

Gemini ELSS In Vacuum Chamber Testing


65-11-12

Double-Header Mission Gemini VII/VI Planned

Crews named for Rendezvous-EVA Gemini IX mission

NAA's Saturn S-II Stage Most Powerful Hydrogen Powered Booster Now In Production


65-11-26

WSTF Test Will Man-Rate Apollo Launch Escape System

Gemini VII Fuel Cells Replaced; Still Plan December 4 Launch

Application Satellite Tracking-TM Station To Be In Australia

Apollo Suit, PLSS negotiations begun with 2 firms

Gemini VIII EVA Equipment Enters Chamber Qualification

IBM Supporting Apollo In Flight Hardware, Ground Control

Apollo Surf Recovery Tests Check Equipment, Techniques


65-12-10

No Holds Gemini VII Launch Dual Mission’s Perfect Start

Scout for Apollo

Simulates Apollo Missions

Bendix support of manned spaceflight operations ranges from ground control to post-Apollo concepts


65-12-23

First Rendezvous, 14-Day Duration, Climax Successful Gemini VII/VI

Manned tests of chamber B include temperature extremes

Gemini VII/VI Mission As Seen From The Ground

Gemini VIII, Agena hardware tests continue on schedule

What Rendezvous Looks Like Up Where It's Happening


66-01-07

World's First Rendezvous Made To Sound Simple

Moonrise As Seen In Orbit

1965-A Year of Achievement in the Nation's manned and Unmanned Space Flight Programs


66-01-21

Gemini Maneuver Unit Tested in High Vacuum

Center accepts space chamber for Apollo tests

Another Step Toward Lunar Landing

Personal spacecraft

Saturn/Apollo 201 Begins to Take Form at Launch Complex 34

Apollo Recovery Beacon Gets Gulf Shakedown

Apollo reentry from lunar missions depends on Avco heat shielding

Apollo Power System In White Sands Tests

It's a better spacecraft than boat


66-02-04

Gemini VIII Hard-Mate Nears As Interface Tests Continue

MSC Studies Prototype Lunar Geology Tool Box

Saturn/Apollo 201 mock countdown

Apollo CSM contract converted to incentive

Motorola communications equipment aboard Mercury, Gemini, Apollo spacecraft

Experiments Picked For Use in lunar Surface Package

Apollo Launch Escape System Now Fully Man-Rated


66-02-18

Lunar Orbiter Spacecraft Passes Tests of Photo-Return Equipment

‘Clean test’ says Shea of Apollo 201 review

Lunar Drilling Drill


66-03-04

Near-Perfect S/A 201 Follows On-Again Off-Again Count

Gemini VIII Scheduled For March 15 Launch

How to Properly Re-mount the LEMAfter A Moon Stroll


66-03-18

Post Docking Troubles Force Early Landing of Gemini VIII

'Little Squirt' Aids Landing Group In Apollo Soft-Landing Development

Quick-Look Data Shows Apollo 201 Meets Primary Mission Objectives

Apollo Swings,Man

Apollo fuel cell passes 1000 hour run mark


66-04-01

Mission Evaluation Team Lauds Quick-Thinking Gemini VIII Crew

First Manned Apollo Flight Crew Selected

Gemini Docks Easily With Agena But Stuck Thruster Ends Mission

GEMINI VIII'S SUCCESSES AND DISAPPOINTMENTS AS SEEN BY THE CAMERA

NASA Selects Bendix To Build Lunar Package


66-04-15

NEWLY-SELECTED GROUP OF 19 ASTRONAUTS REPORTS NEXT MONTH FOR DUTY

Production Apollo CM arrives for sea tests

Fifth S-1B static fired in Marshall test stand


66-04-29

Gemini IX Launch Scheduled NO Earlier Than May 17

Study Contracts Signed For S-IVB Experiment

Cape Testing Continues On Gemini IX A/S 202

A/S 202 Command Module Shipped To Cape Kennedy

Saturn S II Stage Static Fired In First Test At Mississippi Site

Apollo command module tumble test


66-05-13

Gemini IX Looks Good For Tuesday Launch

Apollo Mission Simulator Gives Liftoff-to-Reentry Realism

Gemini IX Called 'Most Sophisticated Mission to Date'

Gemini IX's Agena Target Vehicle passes pre-launch test series


66-05-27

Scrubbed Gemini IX mission reset for May 31 launch

LEM adapter arrives for vibration testing

Saturn V test vehicle moves to launch pad


66-06-10

Surveyor Soft-Lands On Surface of Moon

Gemini IX Logs 3 Rendezvous, Long EVA, Precise Landing

Soft Landed Surveyor A Transmits High-Detail Photos

Saturn V Learns to Crawl Before it Can Fly

Radar system chosen for lunar rendezvous


66-06-24

Rendezvous-EVA Gemini X Set For July 18 Launch

Apollo Chamber tests to start this summer

White Sands flights Man Rated Apollo LES

Saturn V access arms undergo shakedown tests

Portrait of a hurricane satellite photos

Scale Air-Cushion Vehicles Test Translunar Doceking Hardware


66-07-08

EVA Rehearsal [Michael Collins weightless training]

A/S 204 flight boosts S-IVB restart reliance

Gemini X cape preparations keeping to launch schedule

Gemini VII experiments findings

Lunar Orbiter Launch Delayed

Surveyor Surveys


66-07-22

Gemini X topples records, achieves basic goals

Stage bursts in final tests of Apollo 203

Comsat supports Apollo missions with satellites


66-08-05

Gemini X flawlessly makes deepest venture into space

Gemini XI, Apollo 202 cape tests underway

Apollo 202 Tests Ablative Shield in high heat reentry condition

Off-Line Computer Aids Mission Operations

Apollo 008 Undergoes Manned Chamber Test


66-08-19

Gemini XI Mission Features First Revolution Rendezvous

Apollo 202 leads way for manned missions

MSC testing gathers data for first manned Apollo flight

Apollo SPS tests begin at WSTF

Apollo 008 vacuum chamber testing

Flying bedstead photo

Lunar Orbiter Scouts Apollo Landing Zones

Saturn stages arrive at KSC


66-09-02

Apollo 202 Brings Program Step Nearer Manned Flight

Gemini XI mission schedules first full automatic reentry

Apollo Spacecraft 012 n Preflight KSC Tests


66-09-16

Lunar Orbiter snaps last photos of moon

Many Space Firsts Scored During Gemini XI Mission

Surveyor B Launching  Scheduled for Tuesday

Camera captures Gemini XI preparation


66-09-30

Second manned apollo crew selected

Gemini XI crew face the press

Surveyor II crashes, trouble in descent rocket


66-10-14

Astronauts to fly lunar landing trainer here in '67

Apollo Spacecraft makes good boat in sea trials

Four day Gemini XII is program’s finale


66-10-28

Decision announce to man Apollo 204

Men and hardware prepare for first manned Apollo flight

Lunar orbiter photo presentation of Earth image

Gemini XII spacecraft begins testing


66-11-11

Twice-Scrubbed Gemini XII Scheduled for Launch Today

First Manned Apollo Crew Learns How to Abandon Ship

Astronaut Aldrin Practices Underwater For Gemini XII EVA

Apollo Ends Six Day Chamber Test


66-11-25

Gemini XII Flight Closes Out Achievement Packed Program

Test problems cause Apollo flight reshuffle


66-12-09

ECU leak delays Apollo 204 tests

ALSEP artist impression

Orbiter Copernicus photo

Engines for Saturn

Gemini XII Crew Describes Flight Of Last Mission in Gemini Series

First Applications Satellite launched

S-II test stage fired


66-12-23

Gemini missions overview


67-01-06

Flight crews selected for 2nd, 3rd Apollos

NASA buys 3rd Apollo simulator

MSC employees commended for rescue in chamber emergency

Flight controllers have to learn complicated Apollo cockpit layout

Apollo guidance tests link labs miles apart

ATS-1 image

Lunar orbiter makes 6 degree plane change


67-01-20

First manned Apollo mated to Saturn launch vehicle

Gemini, Surveyor, Lunar Orbiters


67-02-03

Apollo 204 crew die in flash fire

MSFC builds laboratory lunar limousine

Board investigates S-IVB explosion

Saturn stages make voyages to test sites


67-02-17

3 Apollo missions scheduled for 1967

Lunar Orbiter II begins snapping landing sites

ESSA IV Nears Operation Status With Transfer


67-03-03

204 board reports tentative findings [Apollo 1 fire]

How to build a Saturn V stage photos

2nd S-II flight stage goes into MTF tests


67-03-17

Lunar sample scientists selected

Lunar Orbiter III photos

Lunar module walkthrough (single photo)

Multiple docking adapter added to Apollo Applications hardware

Saturn V test stand operational after static firing of S-IC stage


67-03-31

Saturns shuffled for Apollo 206 test flight

New tracking station dedicated at Canberra

Lunar lander trainer to be built for MSC

Lunar Orbiter Takes Posthumous Photo of Surveyor I


67-04-14

Orbiter corrects camera fog problem

Apollo 204 board submits findings

Apollo Helo recovery begins phase II tests

Orbiter's film system fails in final readout

MPAD planners design manned flights from launch to splashdown


67-04-28

Water tank simulates zero-g for training

Lunar ditch digger (surveyor photos)

Rolling stone makes track in lunar crater

Apollo 204 board submits findings [apollo 1 fire]

Orbiter's Film System Fails in Final Readout

Apollo helo recovery begins phase II tests

MPAD planers design manned flights from launch to splashdown


67-05-12

Webb names crew for manned Apollo

Lunar Orbiter IV begins mapping lunar surface in near-polar orbit

Pioneers VI & VII gather data on Earth magnetosphere, Solar wind

Surveyor III shows versatility as photographer


67-05-26

First Apollo crew describes spacecraft changes

Solar activity closely monitored by MSC group operating SPAN facility

Where do we go from the moon? 6 reporters give their views

Lunar Orbiter corrects camera fog problem

MSC' Spacecraft Impact Facility Simulates Water Land Touchdown

Saturn V stage fired at MTF


67-06-09

Mutinous boilerplate scuttled by gunfire

Welds checked on Saturn

ALSEP contract changed to include heat-flow station

Orbiter IV ends job after 99% coverage

Orbiter IV photo

Apollo EMU suit photos


67-06-23

Lunar module changes increase crew safety

Orbiter's orbit lowered to gain next flight data

Orbiter photos compared with Surveyor

Melpar picked to build lunar quarantine units

Where the moon meets Earth (Lunar receiving laboratory article)

Latter day armor suit

First volume published in Gemini photo series


67-07-21

Orbiters sub for Apollo in tracking practice

Network gaps filled by Apollo ships

Surveyor IV goes dead after ideal trajectory


67-08-18

Apollo/Saturn roll out preludes major flight test

Orbiter image of Earth

Scott Carpenter to leave NASA

Apollo Saturn V major ground tests complete

Moon rocket assembly cutaway view

Some highlights from highly successful Lunar Orbiter program

Lunar Orbiter program has successful finale


67-09-01

Saturn V vehicle makes trip to pad

Orbiter V image

Revamped Apollo pressure suits delivered for thermo-vacuum tests


67-09-15

Orbiter III orbit now simulates Apollo track

Apollo IV prelaunch starts at launch control

Surveyor V flight averts failure - soft lands

Lunar orbiter V photos confirm Tycho meteorite origin


67-09-29

Apollo IV launch schedule depends on CDT results

Ground Controllers Save Two Faltering Missions

New Biological Isolation Garment Added to Apollo Crew


67-10-13

Surveyor V answers many questions


67-10-27

Apollo IV stack completes KSC flight readiness test

LM-2 switched to unmanned, backs up LM-1

Control center to be busy place during Apollo IV count, mission


67-11-10

Two orbiters scuttled to clear frequencies

Apollo IV launched planned Thursday

Flight controller hopes he won't be needed

AAP ECS to undergo manned chamber tests

Velcro invention!


67-11-24

Apollo schedule plans 11 missions in 2 years

Apollo IV/Saturn V flight called textbook (with photo)

2nd manned Apollo flight crew announced

Earth crescent photo from Apollo IV


67-12-08

Apollo IV flight data confirmed objectives met

Newest Apollo suit in man-rating test


67-12-22

Apollo V Vehicle Nears OK, MSC Runs Support Testing

Apollo suit test slips 3 weeks

Last lunar trainers delivered to center


68-01-05

Lunar Module I Loaded With Hypergolic Propellant

Revised Apollo Chutes pass El Centro Tests

Apollo ship Mercury gets final fitting out

Midget satellite plays tracking target part


68-01-19

Apollo V lunar module test planned for Monday launch

Apollo CM fire tests run in enriched air

Moonwalker's new clothes photo

Apollo parachutes fail in el centro air drop

LRD prepares Apollo CM 007A for sea tests

LRD checks out new gear during Apollo V mission

1967  year of space achievement and setback

Apollo testing keeps facilities at MSC busy

Apollo V flight control team to put LM-1 through paces

Apollo V launch set Monday


68-02-02

Apollo V meets most goals in switch to alternate plan

Apollo VI trip to pad scheduled next week

LM-2 shipment delayed pending Apollo V review

Lunar module proves maturity as first-flight data sorted out

Apollo V mission events


68-02-16

Orbiter V scuttled as gas runs low

Apollo VI moves to pad 39

Orbiter image of landing site

5 sites selected for lunar landing

Engineers cut Apollo flammability through use of 'arson' techniques

ATS-III revives after camera problem clears


68-03-01

Apollo VI launch no earlier than March 21

Apollo Gulf exercises scheduled this month


68-03-15

Apollo VI launch date moved to March 28


68-03-29

Apollo VI flight next week to aims to man-rate Saturn V

..About the weather - spaceflight meteorology group

Apollo post-landing test set in gulf next week

Dilutes oxygen is approved for Apollo cabin at launch

Decision made to man 2nd LM mission


68-04-12

Kraft assigns Kranz, Lunney to first manned Apollos

Balky S-IVB engine forces alternate Apollo VI mission

Ames scientists develop method to calculate lunar soil depths


68-04-26

Apollo director recommends 3rd Saturn V fly manned

Apollo VI launch data examined to show Saturn V misfire cause

Command Module takes its lumps at MSC's impact test facility


68-05-10

Armstrong unhurt in ejection from moon lander trainer

Webb OKs Philips plan to man 3rd Saturn V late this year

Apollo parachute drop successful


68-05-24

MSC, Brazil launch radiation belt probe

Apollo 101 SM goes to KSC, support testing continues

How to build weather photo ground station


68-06-07

Apollo VII shipped to cape

Testing goes into high gear for 1st, 2nd manned Apollos

Fuel injectors switched in first manned LM

LTA-8 chamber test ‘unqualified success'

Apollo's 4th module: the spacesuit


68-06-21

Crew entered Apollo 2TV-1 for 7 day vacuum test

Brazil, MSC launch VAB probe

Apollo VII undergoes combined system test

Apollo chute test series nears finish


68-07-05

Successful Apollo 2TV-1 test called significant milestone

Labs hard at gathering data for 1st, 2nd manned Apollos

PLSS for Apollo EVA gets vacuum checkout


68-07-19

Apollo 7 Status

Apollo 7 crew to benefit from high school girl’s suggestion


68-08-02

Engineers choose fix to remedy Saturn V pogo during launch

Apollo VII spacecraft passes manned altitude test series

Spinal growth forces Collins to leave 3rd Apollo crew

Flight model ALSEP accepted by centre


68-08-16

MSC seeks proposals on 1-man lunar flyer

Apollo 7 hauled to Pad 34 for mating with Saturn 1B

2TV-1 readied for 2nd Apollo manned runs

Lovell replaces Collins on 3rd Apollo crew

Apollo VII crew draws a half day of sea duty (photos)


68-08-30

Apollo VIII revamped to omit lunar module operations

Apollo VII in checkout for October launch

Astronaut rescue pact goes to senate for OK


68-09-13

Crew Exist 2TV-1 after 125 hour test

Apollo VII CDDT begins, pad egress completed

Nixon visits MSC photo

Fuel cell completes triple lifetime test


68-09-27

Schirra says Apollo VII just about ready to fly

Lunar module readied for chamber testing

Fourth Saturn V barged to cape

Rocketdyne injector selected for LM ascent


68-10-11

Apollo VII count looks good for today's planned launch

Apollo ALSEP training photo


68-10-25

Investigators pin down LLRV accident cause

Apollo VII shakedown meets 101% of mission goals (+ photo)

LTA-8 in tests for lunar flights

Apollo VIII crew practices egress


68-11-08

Management ponders options for final Apollo VIII profile

LRL finishes 10 day dry run

Hurricane Gladys photo from Apollo VII


68-11-22

Apollo VIII scheduled for orbital flight around the moon

Experiments selected for first lunar landing

Stafford, Young, Cernan named Apollo X crew

LTA-8 manned tests successfully completed


68-12-06

Apollo VIII countdown tests scheduled early next week

Apollo guidance programs sound like racetrack lineup

Apollo countdowns take 500 miles of recording tape

Heatshield researchers find fireproofing foam


68-12-20

Apollo VIII onboard TV gets world wide relay

Apollo VIII lunar mission set for launch tomorrow

LLTV eject photos


69-01-10

Apollo IX launch date set for Feb 28

Apollo VIII's moon voyage brings home cargo of data

Apollo VIII flight logs long list of firsts


69-01-24

Flight crew named for possible lunar landing

EASEP deployment training photo


69-02-07

Apollo IX countdown test scheduled for next week

LM fittings beefed up against stress corrosion

Lunar sample area on operational status

Paine directs restudy of LLTV crashes


69-02-21

Apollo IX mission packs busy timeline into 10 days

KMSC radio covers Apollo missions


69-03-07

Mobile quarantine trailer gets test during Apollo IX

Apollo IX up and orbiting first manned LM flight

Apollo XI rock training photo

Apollo IX four barrel camera shoots Earth resources


69-03-21

LM-2 drops simulate landing accelerations

Successful Apollo IX forges missing link in all-up stack

Apollo X launch set for May 18


69-04-04

Week long sim tests LRL quarantine area

Apollo X rehearses for lunar landing

Hardware pipeline fills up for busy Apollo schedule


69-04-18

Apollo X may carry color TV system

Apollo X to sort unknowns before lunar landing flight

Conrad, Gordon, Bean selected for Apollo XII

Lunar landing trainer resumes test flight program at Ellington


69-05-02

Apollo X go ahead despite difficulties

Stamp honors Apollo VIII


69-05-16

Apollo 10 - last step to moon - blasts off Sunday

Apollo 10 plans first color TV from outer space

Apollo 11's mobile home arrives

Mercury's Shepard rejoins flight group

Lunar mission will send back TV from the moon


69-05-30

Unofficial countdown to July landing anticipates go ahead from Apollo 10

Apollo 10 splashes into ocean on target

Color TV from space enlightens and entertains

Crew systems needs volunteers to test variety of mission hardware

Photo of high altitude chamber testing


69-06-13

Apollo 10 returned navigation, site data

LRL prepares for first moon-data assignment: preliminary exam of lunar rock samples


69-06-27

CCDT's begin on Apollo 11; July launch date holds firm

SPAN to guard Apollo 11 from radiation overdose

Spanish now operating Madrid tracking station

Armstrong qualifies in LLTV (photo)


69-07-11

National goal nears fulfilment in Apollo 11 moonshot

Crew reveals mission firsts in conference

NASA selects 3 small mementos to commemorate manned landing

Landing site choice photo

Busy timetable set for first moonwalk

Space suit designs vary with need for protection, comfort and utility

Armstrong on geology field trip photo

8 day mission will land, gather samples, deploy experiments

MSN links spacecraft

Snack pantry added by Apollo 11 as variety in space menus increases


69-07-25

Triumphant Apollo 11 returns to Earth

Apollo's quarantine started on the moon

Car like vehicle planned for use in later landings

Nixon phone call

EASEP functions well, begins to send data


69-08-08

Crews named for Apollos 13 and 14

Apollo 12 to aim for Surveyor site

Experiments begin on lunar samples

CRA personnel show no signs of contamination

Work starts on bio-prime samples

LRRR bounces back beams


69-08-22

Mueller outlines future Apollo objectives

Eagle's crew praises equipment, sys lunar EVA ‘pleasant period'

Aldrin photo

Tranquility base seismic package turned back on

Lunar material from 2nd Apollo 11 box sifted (photo)

AAP revamped to use Saturn V to orbit dry science workshop


69-09-05

Scientists lose control of lunar seismometer

Lunar samples undergo further scrutiny in lab

NASA plans sample release

Apollo tape sells for youth center

For those who would ask ‘what price glory?'

Apollo 11 color prints available through GPO


69-09-19

Preliminary Examination Team reports findings

MSC releases samples to world's scientists

Rewards from space research just beginning


69-10-03

Sounding rocket probes South Atlantic radiation

Apollo 12 stack undergoes tests

Scientists sign out lunar samples

Photo of Apollo 11 Smithsonian rock

3 Apollo tracking ships retire

Mercury, Gemini, Apollo - how they got their names


69-10-17

Apollo 12 launch window opens Nov 14 - 32 hours on the moon

The crest of Apollo 12

Lunar samples distributed

Chart spells out lunar missions through Apollo 20


69-10-31

Apollo rock on display in MSC


69-11-14

Launch day for Apollo 12

ALSEP provides stepping stone to the planets


69-11-28

Launch to splash - a magnificent crew, a superb performance

Re-usable shuttle is planned for late 70s


69-12-12

28 days without sun

Giant step group ends world tour

US pavilion at expo features NASA

Schedule for moon stones


70-01-02

1969: we reach the goal

Apollo 13 to land at Fra Mauro

Apollo 11 rock sample investigators to tell all at January conference

Lab tests show Apollo 12 camera tube half burned


70-01-16

An educators view of Apollo

Buying a trip to the moon

Apollo 13 crew training photos


70-01-30

New labor-saving device: the MSC ‘rickshaw’ [MET]


70-02-13

Now on deck: Apollo 13

12-14 crews fly to faraway spots

Surveyor camera (photo)


70-02-27

Distribution of Apollo 12 rocks was lots different

MET training photo


70-03-13

Apollo 13 site promises new lunar data

Chamber A test of SESL


70-03-27

Moon rock is socko

15 crew is announced


70-04-13

Apollo 13: 3rd mission to the moon

Apollo 11 will be 're-launched'


70-04-24

MSC rolls out the red carpet for 13 crew


70-05-08

Apollo 13 review continues at MSC


70-05-22

Armstrong goes to HQ in July


70-06-05

Grandfather rock among samples

Apollo 13 spotlights mission simulators


70-06-19

Space exhibit at Expo a crowd pleaser

Lunar landscape photos available from GPO


70-07-03

Apollo 14 modifications cause delay in launch

Control of TIROS given to ESSA


70-07-17

Laser reflector added to Apollo 14

Apollo 11 sample reported missing

A year ago? It seems like yesterday


70-07-31

Apollo 15 crew views Canadian crater blast

Apollo 11 new mineral named Armalcolite

They came to see where 'Giant Leap' started


70-08-14

NASA names RCA to build Rover TV unit

NASA reviews remaining Apollo flights

Shuttle to cut space costs


70-08-28

LM program update photos

Spacecraft Systems Trainers Service Assist To Flight Controllers


70-09-11

Extra battery, more oxygen added to SM


70-09-25

Crew to use thumper and setup grenades on Fra Mauro

Brazil launches to study radiation belt


70-10-09

Fourth US lunar landing scheduled for Hadley-Apennine

Crew health stabilisation plan announced for Apollo 14

Moon samples returned by Luna quarantined


70-10-23

NASA/Soviet to discuss space docking

Space controllers begin simulations

FSD completes MSC internal validation for Apollo 14

Apollo 14 crew to train in gulf


70-11-06

Apollo 14 rollout set for Monday at KSC

Versatile, practical: program for the 70s


70-11-20

MSC tests show water, oxygen available from lunar soil

ALSEP marks 1st anniversary - ALSEP control centre photo

NASA gets 1-G rover trainer

9th Saturn V goes to the pad


70-12-04

Cooling water buddy system to be carried on Apollo 14

Apollo 14 tests pick up after problem delays


70-12-08

Emergency control centre prepared to take over flight

Apollo 14 launch vehicle modified


71-01-15

Zero-G inflight demo to be flown aboard Apollo 14


71-01-29

Shepard, Roosa, Mitchell healthy ready for Apollo 14 moon trip

COMSAT to take part in Apollo 14 mission

Aldrin to leave astronaut corps


71-02-12

Astronaut land at Fra Mauro, splashdown in the Pacific

Eyewitness to history


71-02-26

Crew in good health, rock testing has begun

Over 40 million see moon rocks, visit space agency facilities

Apollo 14 photos


71-03-12

Apollo 16 crews announced

Astronauts on tour represent team effort


71-03-26

Rio Grande Gorge provides good training area for Apollo 15 crew


71-04-09

SESL completes 2TV-2 testing

Thermal-vacuum tests for Skylab and J series Apollo missions are successfully concluded in SESL


71-04-23

Apollo 14 booklet now available

Rover passes new series of tests


71-05-05

Shepard compares his Mercury and Apollo missions


71-05-21

Apollo 15 crew to perform 5 EVAs

Navy to cachet Apollo 15 covers


71-06-18

US & Russians swap space samples


71-07-02

Soviet cosmonauts die during reentry

Apollo 15 geology training photo

US Soviet docking discussions


71-07-16

Apollo 15 loaded with science tasks

Subsatellite to relay lunar data for year beyond mission end

Soviet lunar samples given to US scientists

Medics give Apollo 15 crew 'go'

Apollo 14 samples differ from prior digs

Crew photo

Rover comms diagram


71-07-30

Lunar touchdown on tap for today

15 crew to wear suits


71-08-13

Moon crew investigators delighted with scientific return from Apollo 15

Apollo 15 photo album


71-08-27

Apollo 15 rocks, experiments give new clues to nature of moon

NASA announces Apollo 17 crew


71-09-10

Apollo 15 science research results revealed

UN salutes Apollo 15


71-09-24

Scientists attempt to set age of white rock

Apollo 11 medals go to work force

Skylab Apollo telescope mount photo


71-10-08

Apollo 15 chute test results revealed


71-11-05

Apollo 16 event timeline revealed


71-11-19

Moon specimens sent to scientists

Brad achieves impossible dream [Apollo 15 home mock-up]


72-01-07

Duke hospitalised


72-02-18

Apollo 17 landing site set

Apollo 15 view of Apollo 17 site


72-03-03

10000 year old man and Apollo


72-03-17

Health stabilisation watch begins over Apollo 16 crew


72-03-31

Young and Duke become first moon based astronomers

Computer and illustrator team up for fast draw views of moon

Nixon letter

Apollo 16 crew plus Brad Perry set for launch


72-04-14

Countdown continues for Sunday's launch

LRV traverse map


72-04-28

Apollo 16 home after busy trip

Jump salute TV image

Scientific packages working

Apollo 16 photos


72-05-12

Apollo 16 images [including ‘C rock’]


72-05-26

Moon grenade firing yields surprise - regolith thicker than thought

Moonwalkers Mitchell and Irwin to retire

Mission control - the voice heard around the world


72-06-09

16 subsatellite hits moon

Lessons for last Apollo [training photo]

Staff Support Rooms Help Make Mission Control Tick


72-06-23

Communications and computers vital to control centre


72-07-20

It happened three years ago - the eagle has landed


72-08-04

Apollo 16 rocks low in density - may have come from original crust

Apollo 17 rover and map photos


72-09-01

Last Apollo to land on moon 1:55 December 11

Ability to talk to instruments, men in space vital


72-09-15

Flight Control Teams Speak Bits and Pieces to Spacecraft [tracking and comms article]


72-09-29

Apollo 17 patch design

New creature comfort added to Apollo 16 suit


72-10-13

Apollo 17 tank training for weightlessness photo


72-10-27

Travellers call for reservation to view Apollo 17 launch at cape

Rover to travel further, carry more on Apollo 17

Emblem for last Apollo sums up programs past, future


72-11-10

Apollo 17 night launch to be spectacular

Cernan flies LLTV [photo]

Last LRV training for Apollo 17 [photo]


72-11-24

Roundup says 'Right on' Apollo 17

Apollo 17 poised for launch [photo]

A New Era of Space Exploration Begins


72-12-08

Final manned mission successfully launched

LLTV aircraft retired

Apollo 17 rover to travel further


72-12-22

Astronauts returned to MSC

Men conferred on Earth as astronauts explored moon

Apollo 17 TV images


73-01-05

Orange soil undergoes close examination

Apollo 17 lift off images

Looking over the shoulders of the Apollo 17 crew

Earth mechanics aid moon drivers [LRV fender repair]


73-01-19

Lovell to leave NASA

Apollo 17 images


73-02-02

Student analyses lunar samples

Moon rocks issued


73-03-16

Apollo 17 Results Discussed at Lunar Science Conference


73-03-30

Rocks exchanged